Skip to content
Gridcensus

Del Norte, California · CAISO

DC Readiness
43.1
Fair / 100

TAP203299 is a substation-adjacent datacenter candidate site in Del Norte, California, interconnecting through CAISO. It screens at 43.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP203299
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait8.2 yrs

Connectivity

Nearest IXPHemlock Plaza
IXP distance20.1 mi
Fiber providers3
Fiber coverage44.2%

Site characteristics

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score52/100

Location context

Nearest datacenterHemlock Plaza
DC distance20.1 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity22.19¢/kWh
Industrial electricity17.82¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$10,206

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
31
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
24
Natural hazard8%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Del Norte, ranked by DC Readiness.

Sites near TAP203299
SiteTypeVoltageCapacityQueue waitScore
BROOKINGSSubstation-Adjacent115 kV100 MW6.9 yrs52.6
PARKVIEWSubstation-Adjacent115 kV100 MW6.9 yrs52.5
HARBORSubstation-Adjacent115 kV100 MW6.9 yrs52.4
UNKNOWN203290Substation-Adjacent115 kV100 MW8.2 yrs47.7
UNKNOWN203303Substation-Adjacent115 kV100 MW8.2 yrs47.3
DEL NORTESubstation-Adjacent115 kV100 MW8.2 yrs47.0
TAP203302Substation-Adjacent115 kV100 MW8.2 yrs46.0
UNKNOWN203293Substation-Adjacent115 kV100 MW8.2 yrs44.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203299, Del Norte. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.