DC Readiness
58.1
Good / 100

Greenfield (UNKNOWN117272 - RITCHIE STATIO) is a greenfield datacenter candidate site in Phillips County, Arkansas, interconnecting through MISO. It screens at 58.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117272
Substation voltage230 kV
Available capacity300 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance34.2 mi
Fiber providers2
Fiber coverage7.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance366.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerYoung Michael W
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score52/100
Construction cost index50.0 (avg 100)

Location context

Nearest datacenterARE-ON Forrest City
DC distance34.2 mi
Nearest rail3.2 mi
Nearest gas pipeline2.3 mi
Nearest fiber route121.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.41¢/kWh
Industrial electricity11.54¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,345

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
48
Fiber connectivity12%
49
Energy cost10%
89
Water risk8%
86
Natural hazard8%
52
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
100
Gas pipeline2%
93
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Phillips County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN117272 - RITCHIE STATIO)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117272Substation-Adjacent230 kV300 MW1.4 yrs64.5
TAP149969Substation-Adjacent230 kV300 MW1.4 yrs63.3
UNKNOWN121327Substation-Adjacent115 kV100 MW1.4 yrs62.5
TAP149970Substation-Adjacent230 kV300 MW1.4 yrs61.9
UNKNOWN121328Substation-Adjacent115 kV100 MW1.4 yrs60.1
UNKNOWN107728Substation-Adjacent115 kV100 MW1.4 yrs59.2
UNKNOWN121326Substation-Adjacent115 kV100 MW1.4 yrs59.1
Greenfield (STUTTGART RICUSKEY - TAP149970)Greenfield230 kV300 MW1.4 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN117272 - RITCHIE STATIO), Phillips County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.