UNKNOWN318105

Substation-Adjacent

Mohave County, Arizona · WECC

DC Readiness
56.1
Good / 100

UNKNOWN318105 is a substation-adjacent datacenter candidate site in Mohave County, Arizona, interconnecting through WECC. It screens at 56.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN318105
Substation distance0.0 mi
Substation voltage110 kV
Available capacity50 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth68
Avg queue wait5.7 yrs
Recent queue wait5.7 yrs
Completion rate10%
Withdrawal rate90%

Connectivity

Nearest IXPDataBank Las Vegas (LAS1)
IXP distance88.6 mi
Fiber providers12
Fiber coverage75.3%
Nearest cloud providerGCP
Nearest cloud regionus-west4
Cloud region distance95.8 mi

Site characteristics

Parcel ownerNeedles Public Utilites Authority
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)4.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteDOHS SAN BERNARDINO COUNTY
Hazard sub-score68/100
Construction cost index71.8 (avg 100)

Location context

Nearest datacenterGoogle
DC distance86.1 mi
Nearest rail0.4 mi
Nearest gas pipeline4.8 mi
Nearest fiber route167.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.22¢/kWh
Industrial electricity10.83¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$1,045

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
30
Fiber connectivity12%
71
Energy cost10%
90
Water risk8%
43
Natural hazard8%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
25
Land / acreage3%
54
Construction cost3%
90
Gas pipeline2%
85
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Mohave County, ranked by DC Readiness.

Sites near UNKNOWN318105
SiteTypeVoltageCapacityQueue waitScore
MOHAVESubstation-Adjacent500 kV1,000 MW5.7 yrs74.8
PEACOCKSubstation-Adjacent345 kV600 MW5.7 yrs66.1
TAP318039Substation-Adjacent230 kV300 MW5.7 yrs64.1
SOUTH POINT ENERGY CENTERSubstation-Adjacent230 kV300 MW5.7 yrs63.8
TAP310930Substation-Adjacent230 kV300 MW5.7 yrs63.2
Greenfield (ELDORADO - None)Greenfield500 kV1,000 MW5.7 yrs62.5
TAP318000Substation-Adjacent230 kV300 MW5.7 yrs62.4
Greenfield (MOENKOPI - ELDORADO)Greenfield500 kV1,000 MW5.7 yrs61.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN318105, Mohave County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.