DELTA POWER
Substation-AdjacentFairbanks North Star Borough, Alaska
DELTA POWER is a substation-adjacent datacenter candidate site in Fairbanks North Star Borough, Alaska. It screens at 59.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Fairbanks North Star Borough, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN158551 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 62.7 |
| UNKNOWN158464 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 61.9 |
| UNKNOWN158474 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 61.4 |
| UNKNOWN158489 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 61.1 |
| NORTH POLE | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 60.6 |
| UNKNOWN158550 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 60.5 |
| UNKNOWN158559 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 59.6 |
| EIELSON AFB CENTRAL HEAT & POWER PLANT | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 59.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for DELTA POWER, Fairbanks North Star Borough. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.