Datacenter Sites in Fairbanks North Star Borough, Alaska

Fairbanks North Star Borough has 107 scored datacenter candidate sites averaging 56.5/100 DC Readiness, with a catalogued aggregate of 1,712 MW. FEMA rates local natural-hazard risk as "Relatively Low".

107
Candidate sites
56.5/100
Avg DC Readiness
1,712 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Fairbanks North Star Borough

Site-selection context for Fairbanks North Star Borough

No
Datacenter tax incentive
29.15¢/kWh
Commercial electricity
21.90¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$2,296
Land price / acre
0
Cooling degree days
10,000
Heating degree days
27°F
Mean annual temp

By site type

Top datacenter sites in Fairbanks North Star Borough

Top datacenter sites in Fairbanks North Star Borough
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN158485Substation-Adjacent138 kV100 MW3.5 yrs61.5
UNKNOWN158464Substation-Adjacent138 kV100 MW3.5 yrs61.3
UNKNOWN158470Substation-Adjacent138 kV100 MW3.5 yrs61.1
UNKNOWN158495Substation-Adjacent138 kV100 MW3.5 yrs60.1
TAP158556Substation-Adjacent138 kV100 MW3.5 yrs59.7
UNKNOWN158474Substation-Adjacent138 kV100 MW3.5 yrs59.6
UNKNOWN158558Substation-Adjacent138 kV100 MW3.5 yrs59.4
UNKNOWN158489Substation-Adjacent138 kV100 MW3.5 yrs59.0
FAIRBANKSFederal Excess1.0 yrs58.8
FAIRBANKSFederal Excess1.0 yrs58.6
FAIRBANKSFederal Excess1.0 yrs58.3
FAIRBANKSFederal Excess1.0 yrs58.2
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs58.1
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs58.1
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs58.0
UNKNOWN158468Substation-Adjacent138 kV100 MW3.5 yrs58.0
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.9
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.9
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.9
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.8
COLLEGE MAGNETIC OBSERVATORYFederal Excess1.0 yrs57.8
FAIRBANKSFederal Excess1.0 yrs57.7
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.6
UNKNOWN158550Substation-Adjacent138 kV100 MW3.5 yrs57.6
NESDIS FAIRBANKS AK (GILMORE CREEK) 1 INSTALLATIONFederal Excess1.0 yrs57.5

Fairbanks North Star Borough datacenter FAQ

How many datacenter sites are in Fairbanks North Star Borough?
107 scored datacenter candidate sites, averaging 56.5/100 DC Readiness.
Does Fairbanks North Star Borough offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Fairbanks North Star Borough in our dataset.
What is the natural-hazard risk in Fairbanks North Star Borough?
FEMA's National Risk Index rates Fairbanks North Star Borough as "Relatively Low" (score 18).
What are industrial electricity rates in Fairbanks North Star Borough?
Average industrial electricity is 21.90¢/kWh and commercial is 29.15¢/kWh in Fairbanks North Star Borough.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fairbanks North Star Borough, Alaska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.