Legacy capacity
520
MW

B C Cobb is a coal plant in Muskegon, Muskegon, Michigan, retired 2016-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 520 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity520 MW
Retirement date2016-04-01
EIA plant ID#1695

Grid hookup & remediation

Nearest substation0.2 mi
Operator address151 N. Causeway, Muskegon, MI, 49445
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near B C Cobb, ranked by DC Readiness.

Candidate sites near B C Cobb
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ MuskegonGreenfieldMIMuskegon2.2 yrs62.7
EC Coal Ottawa CountyGreenfieldMIOttawa County2.2 yrs62.3
EC Near J H CampbellGreenfieldMIOttawa2.2 yrs62.1
EC Coal Ottawa CountyGreenfieldMIOttawa County2.2 yrs62.1
UNKNOWN128736Substation-AdjacentMIOttawa County345 kV600 MW3.8 yrs62.1
EC Coal Ottawa CountyGreenfieldMIOttawa County2.2 yrs62.1
OZ MuskegonGreenfieldMIMuskegon2.2 yrs61.9
EC Near B C CobbGreenfieldMIMuskegon2.2 yrs61.8

Nearby internet exchanges

See all datacenter sites in Michigan

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for B C Cobb, Muskegon, Muskegon, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.