WINDSTAR

Substation

Wyoming · PACIFICORP

Max voltage
230
kV

WINDSTAR is an electric transmission substation in Wyoming, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines7

Ownership & operation

OperatorPACIFICORP
StateWyoming
Coordinates42.8617, -105.7795

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69236230 kVPACIFICORP68.9 mi
#68663230 kVPACIFICORP2.4 mi
#68682230 kVPACIFICORP18.2 mi
#68662230 kVPACIFICORP2.7 mi
#71534230 kVPACIFICORP9.5 mi
#69453115 kVPACIFICORP12.6 mi
#69452115 kVPACIFICORP6.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINDSTAR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINDSTAR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201486Substation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.9
LATIGOSubstation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.9
WINDSTARSubstation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.7
Greenfield (UNKNOWN202379 - TAP208906)GreenfieldWYNatrona County230 kV300 MW1.7 yrs67.5
YELLOWCAKESubstation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.1
TAP208906Substation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.1
Greenfield (UNKNOWN202379 - LATIGO)GreenfieldWYNatrona County230 kV300 MW1.7 yrs67.0
UNKNOWN207589Substation-AdjacentWYConverse County138 kV100 MW1.7 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINDSTAR substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.