TECKLA

Substation

Wyoming · BASIN ELECTRIC POWER COOP

Max voltage
230
kV

TECKLA is an electric transmission substation in Wyoming, operated by BASIN ELECTRIC POWER COOP. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorBASIN ELECTRIC POWER COOP
Co-ownerNORTHERN WASCO COUNTY PUD
Co-ownerPOWDER RIVER ENERGY CORPORATION
StateWyoming
Coordinates43.6306, -105.2064

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68684230 kVBASIN ELECTRIC POWER COOP8.7 mi
#68685230 kVBASIN ELECTRIC POWER COOP21.0 mi
#68687230 kVBASIN ELECTRIC POWER COOP30.6 mi
#78030138 kVPOWDER RIVER ENERGY CORPORATION81.6 mi
#77413115 kVNORTHERN WASCO COUNTY PUDIN SERVICE0.2 mi
#77414115 kVNORTHERN WASCO COUNTY PUDIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TECKLA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TECKLA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RENOSubstation-AdjacentWYCampbell County230 kV300 MW1.7 yrs68.6
TECKLASubstation-AdjacentWYWeston County230 kV300 MW1.7 yrs66.6
Greenfield (RENO - UNKNOWN201359)GreenfieldWYCampbell County230 kV300 MW1.7 yrs65.0
TAP204645Substation-AdjacentWYCampbell County115 kV100 MW1.7 yrs64.9
Greenfield (RENO - UNKNOWN201359)GreenfieldWYCampbell County230 kV300 MW1.7 yrs63.0
UNKNOWN205116Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs62.8
TAP204346Substation-AdjacentWYCampbell County115 kV100 MW1.7 yrs62.8
Greenfield (TECKLA - RENO)GreenfieldWYCampbell County230 kV300 MW1.7 yrs62.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TECKLA substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.