TAP209334

Substation

Wyoming · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209334 is an electric transmission substation in Wyoming, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPOWDER RIVER ENERGY CORPORATION
StateWyoming
Coordinates43.5622, -105.3635

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69415115 kVPOWDER RIVER ENERGY CORPORATION1.2 mi
#77414115 kVNORTHERN WASCO COUNTY PUDIN SERVICE0.1 mi
#78032115 kVPOWDER RIVER ENERGY CORPORATION0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209334, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209334 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RENOSubstation-AdjacentWYCampbell County230 kV300 MW1.7 yrs68.6
TECKLASubstation-AdjacentWYWeston County230 kV300 MW1.7 yrs66.6
TAP204645Substation-AdjacentWYCampbell County115 kV100 MW1.7 yrs64.9
Greenfield (RENO - UNKNOWN201359)GreenfieldWYCampbell County230 kV300 MW1.7 yrs63.0
TAP204346Substation-AdjacentWYCampbell County115 kV100 MW1.7 yrs62.8
UNKNOWN205116Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs62.8
Greenfield (TECKLA - RENO)GreenfieldWYCampbell County230 kV300 MW1.7 yrs62.7
UNKNOWN205115Substation-AdjacentWYCampbell County115 kV100 MW1.7 yrs62.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209334 substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.