TAP205630

Substation

Wyoming · BLACK HILLS POWER, INC.

Max voltage
230
kV

TAP205630 is an electric transmission substation in Wyoming, operated by BLACK HILLS POWER, INC.. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBLACK HILLS POWER, INC.
Co-ownerPOWDER RIVER ENERGY CORPORATION
StateWyoming
Coordinates43.9876, -104.4160

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68694230 kVBLACK HILLS POWER, INC.13.6 mi
#71528115 kVBLACK HILLS POWER, INC.1.3 mi
#71575115 kVPOWDER RIVER ENERGY CORPORATION0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205630, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205630 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP205630Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs68.3
UNKNOWN201481Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs67.7
TAP203672Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs66.8
TAP204301Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs63.6
UNKNOWN204407Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs63.6
UNKNOWN205633Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs63.3
TAP205634Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs62.8
Greenfield (YELLOW CREEK - UNKNOWN201481)GreenfieldWYWeston County230 kV300 MW1.7 yrs61.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205630 substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.