TAP205616

Substation

Wyoming · HIGH PLAINS POWER INC

Max voltage
115
kV

TAP205616 is an electric transmission substation in Wyoming, operated by HIGH PLAINS POWER INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorHIGH PLAINS POWER INC
StateWyoming
Coordinates43.0858, -107.1879

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71559115 kVHIGH PLAINS POWER INC11.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205616, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205616 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP204281Substation-AdjacentWYNatrona County230 kV300 MW1.7 yrs67.0
UNKNOWN201886Substation-AdjacentWYNatrona County230 kV300 MW1.7 yrs66.8
UNKNOWN201881Substation-AdjacentWYNatrona County230 kV300 MW1.7 yrs65.7
Greenfield (TAP205652 - TAP204281)GreenfieldWYNatrona County230 kV300 MW1.7 yrs63.3
Greenfield (RIVERTON - UNKNOWN202379)GreenfieldWYNatrona County230 kV300 MW1.7 yrs63.0
Greenfield (SPENCE - UNKNOWN202443)GreenfieldWYWashakie County230 kV300 MW1.7 yrs62.6
Greenfield (TAP205652 - TAP204281)GreenfieldWYNatrona County230 kV300 MW1.7 yrs62.4
UNKNOWN201884Substation-AdjacentWYNatrona County115 kV100 MW1.7 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205616 substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.