TAP203672

Substation

Wyoming · BLACK HILLS POWER, INC.

Max voltage
230
kV

TAP203672 is an electric transmission substation in Wyoming, operated by BLACK HILLS POWER, INC.. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorBLACK HILLS POWER, INC.
StateWyoming
Coordinates44.0942, -104.6369

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68694230 kVBLACK HILLS POWER, INC.13.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203672, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203672 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP205630Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs68.3
UNKNOWN201481Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs67.7
TAP203672Substation-AdjacentWYWeston County230 kV300 MW1.7 yrs66.8
TAP204301Substation-AdjacentWYWeston County115 kV100 MW1.7 yrs63.6
Greenfield (HUGHES - LOOKOUT)GreenfieldWYCrook County230 kV300 MW1.7 yrs63.0
Greenfield (UNKNOWN201360 - UNKNOWN201481)GreenfieldWYCrook County230 kV300 MW1.7 yrs62.2
Greenfield (YELLOW CREEK - UNKNOWN201481)GreenfieldWYWeston County230 kV300 MW1.7 yrs61.9
Greenfield (UNKNOWN201481 - WEST HILL)GreenfieldWYWeston County230 kV300 MW1.7 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203672 substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.