SEMINOE

Substation

Wyoming · HIGH PLAINS POWER INC

Max voltage
230
kV

SEMINOE is an electric transmission substation in Wyoming, operated by HIGH PLAINS POWER INC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorHIGH PLAINS POWER INC
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
StateWyoming
Coordinates42.1562, -106.9083

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69647230 kVHIGH PLAINS POWER INC6.7 mi
#73022115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SEMINOE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SEMINOE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MINERSSubstation-AdjacentWYCarbon County230 kV300 MW1.7 yrs66.0
UNKNOWN201483Substation-AdjacentWYCarbon County230 kV300 MW1.7 yrs65.4
UNKNOWN204217Substation-AdjacentWYNatrona County230 kV300 MW1.7 yrs64.6
FREMONT CANYONSubstation-AdjacentWYNatrona County230 kV300 MW1.7 yrs63.8
UNKNOWN201479Substation-AdjacentWYCarbon County230 kV300 MW1.7 yrs63.3
UNKNOWN202491Substation-AdjacentWYCarbon County230 kV300 MW1.7 yrs62.8
SEMINOESubstation-AdjacentWYCarbon County230 kV300 MW1.7 yrs62.7
Sinclair Oil RefineryBrownfieldWYCarbon County115 kV5 MW1.7 yrs59.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.