DIFFICULTY

Substation

Wyoming · PACIFICORP

Max voltage
230
kV

DIFFICULTY is an electric transmission substation in Wyoming, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPACIFICORP
StateWyoming
Coordinates42.3489, -106.2299

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68660230 kVPACIFICORP13.2 mi
#68661230 kVPACIFICORP44.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DIFFICULTY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DIFFICULTY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DIFFICULTYSubstation-AdjacentWYNatrona County230 kV300 MW1.7 yrs65.0
FREEZEOUTSubstation-AdjacentWYCarbon County230 kV300 MW1.7 yrs64.1
UNKNOWN202483Substation-AdjacentWYAlbany County230 kV300 MW1.7 yrs64.0
DUNLAPSubstation-AdjacentWYAlbany County230 kV300 MW1.7 yrs61.7
Greenfield (DIFFICULTY - UNKNOWN201361)GreenfieldWYConverse County230 kV300 MW1.7 yrs61.6
Greenfield (DIFFICULTY - UNKNOWN201361)GreenfieldWYConverse County230 kV300 MW1.7 yrs61.4
Greenfield (DIFFICULTY - UNKNOWN201361)GreenfieldWYNatrona County230 kV300 MW1.7 yrs60.8
Greenfield (UNKNOWN202483 - DIFFICULTY)GreenfieldWYAlbany County230 kV300 MW1.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DIFFICULTY substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.