DEADHEAD
SubstationWyoming · PACIFICORP
DEADHEAD is an electric transmission substation in Wyoming, operated by PACIFICORP. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #78031 | 138 kV | POWDER RIVER ENERGY CORPORATION | — | 2.8 mi |
| #78208 | 115 kV | PACIFICORP | — | 6.0 mi |
| #78209 | 115 kV | PACIFICORP | — | 0.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DEADHEAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WINDSTAR | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 1.7 yrs | 67.7 |
| YELLOWCAKE | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 1.7 yrs | 67.1 |
| TECKLA | Substation-Adjacent | WY | Weston County | 230 kV | 300 MW | 1.7 yrs | 66.6 |
| UNKNOWN207589 | Substation-Adjacent | WY | Converse County | 138 kV | 100 MW | 1.7 yrs | 66.4 |
| Dave Johnston Mine / Rolling Hills | Brownfield | WY | Converse | — | 119 MW | — | 66.0 |
| GLENROCK | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 1.7 yrs | 65.7 |
| ROLLING HILLS | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 1.7 yrs | 65.3 |
| Dave Johnston Mine / Glenrock Wind III | Brownfield | WY | Converse | — | 39 MW | — | 63.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for DEADHEAD substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.