CLAIM JUMPER

Substation

Wyoming · PACIFICORP

Max voltage
230
kV

CLAIM JUMPER is an electric transmission substation in Wyoming, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPACIFICORP
StateWyoming
Coordinates43.3898, -106.3227

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68666230 kVPACIFICORP36.6 mi
#68681230 kVPACIFICORP4.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLAIM JUMPER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLAIM JUMPER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201486Substation-AdjacentWYConverse County230 kV300 MW1.7 yrs67.9
CLAIM JUMPERSubstation-AdjacentWYNatrona County230 kV300 MW1.7 yrs65.5
MIDWESTSubstation-AdjacentWYNatrona County230 kV300 MW1.7 yrs65.2
Greenfield (UNKNOWN202379 - CLAIM JUMPER)GreenfieldWYNatrona County230 kV300 MW1.7 yrs64.4
Greenfield (UNKNOWN202379 - CLAIM JUMPER)GreenfieldWYNatrona County230 kV300 MW1.7 yrs62.2
UNKNOWN204282Substation-AdjacentWYJohnson County230 kV300 MW1.7 yrs62.1
KAYCEESubstation-AdjacentWYJohnson County230 kV300 MW1.7 yrs61.7
UNKNOWN204284Substation-AdjacentWYJohnson County230 kV300 MW1.7 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLAIM JUMPER substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.