WINE COUNTRY

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

WINE COUNTRY is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates46.2940, -119.9507

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68056230 kVBONNEVILLE POWER ADMINISTRATION24.4 mi
#77697115 kVBONNEVILLE POWER ADMINISTRATION4.9 mi
#77698115 kVBONNEVILLE POWER ADMINISTRATION0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINE COUNTRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINE COUNTRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HANFORDSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs71.4
HORSE HEAVENSubstation-AdjacentWABenton County230 kV300 MW1.7 yrs71.0
OUTLOOKSubstation-AdjacentWABenton County230 kV300 MW1.7 yrs70.5
WAUTOMASubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs70.2
WINE COUNTRYSubstation-AdjacentWABenton County230 kV300 MW1.7 yrs68.4
ALFALFASubstation-AdjacentWAYakima County230 kV300 MW1.7 yrs68.0
Greenfield (WAUTOMA - OSTRANDER)GreenfieldWABenton County500 kV1,000 MW1.7 yrs67.7
UNKNOWN202000Substation-AdjacentWABenton County230 kV300 MW1.7 yrs67.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINE COUNTRY substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.