WESTSIDE

Substation

Washington · AVISTA CORP

Max voltage
230
kV

WESTSIDE is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorAVISTA CORP
Co-ownerBONNEVILLE POWER ADMINISTRATION
Coordinates47.7280, -117.5041

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68105230 kVBONNEVILLE POWER ADMINISTRATION77.2 mi
#68106230 kVBONNEVILLE POWER ADMINISTRATION9.6 mi
#71379115 kVAVISTA CORP4.5 mi
#71380115 kVAVISTA CORP4.0 mi
#71381115 kVAVISTA CORP2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WESTSIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WESTSIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTSIDESubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs73.4
UPRIVER DAM HYDRO PLANTSubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs71.8
LANCASTERSubstation-AdjacentWASpokane County230 kV300 MW1.7 yrs70.8
BELLSubstation-AdjacentWASpokane County500 kV1,000 MW1.7 yrs70.8
UNKNOWN201468Substation-AdjacentWASpokane County230 kV300 MW1.7 yrs70.3
OTIS ORCHARDSSubstation-AdjacentWASpokane County115 kV100 MW1.7 yrs69.9
COLLEGE AND WALNUTSubstation-AdjacentWASpokane County115 kV100 MW1.7 yrs69.7
UNKNOWN205382Substation-AdjacentWASpokane County115 kV100 MW1.7 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.