TAP209297

Substation

Washington · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209297 is an electric transmission substation in Washington, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPUD NO 1 OF GRAYS HARBOR COUNTY
Coordinates46.9693, -123.8288

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74851115 kVPUD NO 1 OF GRAYS HARBOR COUNTY0.9 mi
#77407115 kVNORTHERN WASCO COUNTY PUD0.6 mi
#77985115 kVPUD NO 1 OF GRAYS HARBOR COUNTY0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209297, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209297 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SATSOPSubstation-AdjacentWAGrays Harbor County500 kV1,000 MW1.7 yrs72.0
TAP206448Substation-AdjacentWAGrays Harbor County230 kV300 MW1.7 yrs65.6
TAP207120Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.6
UNKNOWN201837Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.4
TAP207116Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.1
SCOTT STREETSubstation-AdjacentWAGrays Harbor County115 kV100 MW1.7 yrs63.0
TAP206449Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs62.7
UNKNOWN206446Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209297 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.