TAP209288

Substation

Washington · PUD NO 1 OF CHELAN COUNTY

Max voltage
115
kV

TAP209288 is an electric transmission substation in Washington, operated by PUD NO 1 OF CHELAN COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF CHELAN COUNTY
Co-ownerPUGET SOUND ENERGY INC
Coordinates47.7120, -121.1509

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77971115 kVPUD NO 1 OF CHELAN COUNTY4.6 mi
#77972115 kVPUGET SOUND ENERGY INC0.0 mi
#77973115 kVPUGET SOUND ENERGY INC9.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209288, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209288 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs66.9
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs63.2
HYAKSubstation-AdjacentWAKing County138 kV100 MW1.7 yrs62.6
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs61.9
SUMMITSubstation-AdjacentWAChelan County115 kV100 MW1.7 yrs61.5
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs61.4
CASCADESubstation-AdjacentWAKing County230 kV300 MW1.7 yrs61.0
Greenfield (ROCKY REACH - MAPLE VALLEY)GreenfieldWAKing County345 kV600 MW1.7 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209288 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.