TAP209286
SubstationWashington · PUD NO 1 OF CHELAN COUNTY
TAP209286 is an electric transmission substation in Washington, operated by PUD NO 1 OF CHELAN COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #77965 | 115 kV | PUD NO 1 OF CHELAN COUNTY | — | 13.2 mi |
| #77968 | 115 kV | PUD NO 1 OF CHELAN COUNTY | — | 0.0 mi |
| #77969 | 115 kV | PUD NO 1 OF CHELAN COUNTY | — | 6.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP209286, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN203124 | Substation-Adjacent | WA | Chelan County | 115 kV | 100 MW | 1.7 yrs | 65.4 |
| Greenfield (CHIEF JOSEPH - MONROE) | Greenfield | WA | Chelan County | 500 kV | 1,000 MW | 1.7 yrs | 65.2 |
| ANDERSON CANYON | Substation-Adjacent | WA | Chelan County | 115 kV | 100 MW | 1.7 yrs | 64.5 |
| UNKNOWN202969 | Substation-Adjacent | WA | Chelan County | 115 kV | 100 MW | 1.7 yrs | 64.2 |
| Greenfield (CHIEF JOSEPH - MONROE) | Greenfield | WA | Chelan County | 500 kV | 1,000 MW | 1.7 yrs | 63.2 |
| TAP209283 | Substation-Adjacent | WA | Chelan County | 115 kV | 100 MW | 1.7 yrs | 62.6 |
| HYAK | Substation-Adjacent | WA | King County | 138 kV | 100 MW | 1.7 yrs | 62.6 |
| UNKNOWN202968 | Substation-Adjacent | WA | Chelan County | 115 kV | 100 MW | 1.7 yrs | 62.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP209286 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.