TAP209283

Substation

Washington · PUD NO 1 OF CHELAN COUNTY

Max voltage
115
kV

TAP209283 is an electric transmission substation in Washington, operated by PUD NO 1 OF CHELAN COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF CHELAN COUNTY
Coordinates47.7374, -120.7391

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77958115 kVPUD NO 1 OF CHELAN COUNTY14.1 mi
#77959115 kVPUD NO 1 OF CHELAN COUNTY0.2 mi
#77960115 kVPUD NO 1 OF CHELAN COUNTY1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209283, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209283 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs67.1
TAP209281Substation-AdjacentWAChelan County115 kV100 MW1.7 yrs66.0
ANDREW YORK MONITOR & SWITCHYARDSubstation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.8
MISSIONSubstation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.7
UNKNOWN203124Substation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.4
TAP209276Substation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.3
Greenfield (CHIEF JOSEPH - MONROE)GreenfieldWAChelan County500 kV1,000 MW1.7 yrs65.2
TAP209253Substation-AdjacentWAKittitas County115 kV100 MW1.7 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.