TAP209279

Substation

Washington · PUD NO 1 OF CHELAN COUNTY

Max voltage
115
kV

TAP209279 is an electric transmission substation in Washington, operated by PUD NO 1 OF CHELAN COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF CHELAN COUNTY
Coordinates47.5162, -120.4484

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77947115 kVPUD NO 1 OF CHELAN COUNTY2.1 mi
#77950115 kVPUD NO 1 OF CHELAN COUNTY0.8 mi
#77951115 kVPUD NO 1 OF CHELAN COUNTY3.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209279, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209279 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIASubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs74.9
SICKLERSubstation-AdjacentWAChelan County500 kV1,000 MW1.7 yrs70.7
SCHULTZSubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs70.3
UNKNOWN201272Substation-AdjacentWAKittitas County230 kV300 MW1.7 yrs69.9
ROCKY REACHSubstation-AdjacentWAChelan County345 kV600 MW1.7 yrs68.9
Greenfield (COLUMBIA - SCHULTZ)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs68.9
Greenfield (SCHULTZ - SICKLER)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs68.6
Greenfield (SCHULTZ - SICKLER)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209279 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.