TAP209230

Substation

Washington · BIG BEND ELECTRIC COOP, INC

Max voltage
115
kV

TAP209230 is an electric transmission substation in Washington, operated by BIG BEND ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorBIG BEND ELECTRIC COOP, INC
Coordinates46.7658, -118.9630

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77860115 kVBIG BEND ELECTRIC COOP, INC0.1 mi
#77861115 kVBIG BEND ELECTRIC COOP, INC3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209230, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209230 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIA GENERATING STATIONSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs73.5
TAP206105Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.3
TAP209173Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.5
TAP209182Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0
UNKNOWN209177Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0
TAP209178Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs69.8
TAP209181Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs69.3
CASCADE VALLEYSubstation-AdjacentWAGrant County115 kV100 MW1.7 yrs68.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209230 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.