TAP209187

Substation

Washington · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP209187 is an electric transmission substation in Washington, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPUD NO 1 OF FRANKLIN COUNTY
Coordinates46.3006, -119.1360

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72998115 kVPUD NO 1 OF FRANKLIN COUNTY1.1 mi
#77394115 kVNORTHERN WASCO COUNTY PUD0.0 mi
#77807115 kVPUD NO 1 OF FRANKLIN COUNTY1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209187, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209187 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SACAJAWEASubstation-AdjacentWAWalla Walla County500 kV1,000 MW1.7 yrs74.4
MCNARYSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs74.3
TAP203128Substation-AdjacentWAWalla Walla County500 kV1,000 MW1.7 yrs73.6
COLUMBIA GENERATING STATIONSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs73.5
UNKNOWN203430Substation-AdjacentORUmatilla County230 kV300 MW1.7 yrs70.4
Greenfield (TAP203128 - MCNARY)GreenfieldORUmatilla County500 kV1,000 MW1.7 yrs69.8
HIGHLANDSSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs69.7
TAP209202Substation-AdjacentWABenton County115 kV100 MW1.7 yrs69.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209187 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.