TAP209132

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP209132 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates47.1662, -120.8578

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77727115 kVPUGET SOUND ENERGY INC0.9 mi
#77728115 kVPUGET SOUND ENERGY INC4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209132, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209132 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SCHULTZSubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs70.3
Greenfield (SCHULTZ - RAVER)GreenfieldWAKittitas County500 kV1,000 MW1.7 yrs66.5
SAGEBRUSH POWER PARTNERSSubstation-AdjacentWAKittitas County230 kV300 MW1.7 yrs66.4
MISSIONSubstation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.7
TAP209276Substation-AdjacentWAChelan County115 kV100 MW1.7 yrs65.3
ELLENSBURGSubstation-AdjacentWAKittitas County115 kV100 MW1.7 yrs65.2
EAST ELLENSBURGSubstation-AdjacentWAKittitas County115 kV100 MW1.7 yrs65.1
CLYMERSubstation-AdjacentWAKittitas County115 kV100 MW1.7 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209132 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.