TAP209044

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP209044 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates46.9087, -122.6468

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77532115 kVPUGET SOUND ENERGY INCINACTIVE4.0 mi
#77534115 kVPUGET SOUND ENERGY INCIN SERVICE4.1 mi
#77535115 kVPUGET SOUND ENERGY INCIN SERVICE2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209044, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209044 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TRANSALTA CENTRALIA GENERATIONSubstation-AdjacentWAThurston County500 kV1,000 MW1.7 yrs76.1
TACOMASubstation-AdjacentWAPierce County500 kV1,000 MW1.7 yrs75.6
PAULSubstation-AdjacentWAThurston County500 kV1,000 MW1.7 yrs73.6
SOUTHWESTSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs72.4
OLYMPIASubstation-AdjacentWAThurston County500 kV1,000 MW1.7 yrs71.9
UNKNOWN205981Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs71.9
COWLITZSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs71.6
PEARLSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs71.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209044 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.