TAP207857

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP207857 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates48.4431, -122.3320

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78579115 kVPUGET SOUND ENERGY INC1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207857, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207857 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP206066Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs73.0
TAP206065Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs72.5
MURRAYSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.1
Greenfield (MONROE - CUSTER)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs71.1
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs70.2
SEDRO WOOLLEYSubstation-AdjacentWASkagit County230 kV300 MW1.7 yrs70.1
Greenfield (MONROE - CUSTER)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs69.7
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs69.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207857 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.