TAP207735

Substation

Washington · AVISTA CORP

Max voltage
115
kV

TAP207735 is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorAVISTA CORP
Coordinates47.6524, -118.1406

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72592115 kVAVISTA CORP18.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207735, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207735 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWASpokane County500 kV1,000 MW1.7 yrs67.0
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs65.2
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs64.6
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs63.7
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs63.4
UNKNOWN202673Substation-AdjacentWASpokane County138 kV100 MW1.7 yrs63.1
UNKNOWN206288Substation-AdjacentWALincoln County115 kV100 MW1.7 yrs62.6
Greenfield (GRAND COULEE 230KV - BELL)GreenfieldWASpokane County230 kV300 MW1.7 yrs62.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207735 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.