TAP207705

Substation

Washington · PUD NO 1 OF PEND OREILLE COUNTY

Max voltage
115
kV

TAP207705 is an electric transmission substation in Washington, operated by PUD NO 1 OF PEND OREILLE COUNTY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUD NO 1 OF PEND OREILLE COUNTY
Coordinates48.1814, -117.0379

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75855115 kVPUD NO 1 OF PEND OREILLE COUNTY0.1 mi
#75856115 kVPUD NO 1 OF PEND OREILLE COUNTY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207705, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207705 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LANCASTERSubstation-AdjacentIDKootenai County230 kV300 MW1.1 yrs79.2
RATHDRUM POWER LLCSubstation-AdjacentIDKootenai County230 kV300 MW2.0 yrs74.7
Greenfield (LANCASTER - NOXON)GreenfieldIDKootenai County230 kV300 MW1.1 yrs72.4
Greenfield (LANCASTER - NOXON)GreenfieldIDKootenai County230 kV300 MW1.1 yrs71.7
RATHDRUMSubstation-AdjacentIDKootenai County230 kV300 MW1.7 yrs71.7
ATHOLSubstation-AdjacentIDKootenai County115 kV100 MW2.0 yrs69.9
TAP204951Substation-AdjacentIDKootenai County115 kV100 MW2.0 yrs69.0
Greenfield (TAFT - BELL)GreenfieldIDKootenai County500 kV1,000 MW1.7 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.