TAP207599

Substation

Washington · PACIFICORP

Max voltage
115
kV

TAP207599 is an electric transmission substation in Washington, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
Coordinates46.4712, -117.6217

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75414115 kVPACIFICORP8.4 mi
#75415115 kVPACIFICORP0.3 mi
#75416115 kVPACIFICORP22.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207599, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207599 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PHALEN GULCHSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs69.1
LOWER SNAKE RIVER WIND ENERGY PROJECTSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs68.8
ARMSTRONGSubstation-AdjacentWAWhitman County115 kV100 MW1.7 yrs65.6
CENTRAL FERRYSubstation-AdjacentWAGarfield County500 kV1,000 MW1.7 yrs65.3
Greenfield (LOWER GRANITE - HATWAI)GreenfieldWAGarfield County500 kV1,000 MW1.7 yrs65.2
Greenfield (CENTRAL FERRY - LOWER GRANITE)GreenfieldWAGarfield County500 kV1,000 MW1.7 yrs64.5
Greenfield (LITTLE GOOSE - CENTRAL FERRY)GreenfieldWAColumbia County500 kV1,000 MW1.7 yrs64.4
UNKNOWN207690Substation-AdjacentWAWhitman County115 kV100 MW1.7 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207599 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.