TAP207556

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP207556 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates48.2841, -122.6748

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75804115 kVPUGET SOUND ENERGY INCIN SERVICE21.6 mi
#75807115 kVPUGET SOUND ENERGY INCIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207556, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207556 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HARBOUR POINTESubstation-AdjacentWAKitsap County115 kV100 MW1.7 yrs68.7
FREEDONIASubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs68.6
TAP207892Substation-AdjacentWAIsland County115 kV100 MW1.7 yrs67.8
BROOKS HILLSubstation-AdjacentWAIsland County115 kV100 MW1.7 yrs67.0
LANGLEYSubstation-AdjacentWAIsland County115 kV100 MW1.7 yrs67.0
MUKILTEOSubstation-AdjacentWAIsland County115 kV100 MW1.7 yrs66.8
FAIRMOUNTSubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs66.3
TAP206340Substation-AdjacentWAIsland County138 kV100 MW1.7 yrs66.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207556 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.