TAP207554

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP207554 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates48.0082, -122.5193

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75389115 kVPUGET SOUND ENERGY INC0.1 mi
#75800115 kVPUGET SOUND ENERGY INCIN SERVICE5.2 mi
#75802115 kVPUGET SOUND ENERGY INCIN SERVICE7.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207554, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207554 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
SEATTLE CITY EAST PINESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.3
OLIVIA PARKSubstation-AdjacentWASnohomish County115 kV100 MW1.7 yrs70.4
UNKNOWN207884Substation-AdjacentWASnohomish County115 kV100 MW1.7 yrs69.9
BEVERLY PARKSubstation-AdjacentWASnohomish County115 kV100 MW1.7 yrs69.8
SNOHOMISH COUNTY 52ND STREETSubstation-AdjacentWASnohomish County115 kV100 MW1.7 yrs69.8
SNOHOMISH COUNTY HILTON LAKESubstation-AdjacentWASnohomish County115 kV100 MW1.7 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207554 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.