TAP207132

Substation

Washington · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP207132 is an electric transmission substation in Washington, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPUD NO 1 OF CLALLAM COUNTY
Coordinates48.0940, -123.1022

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75169115 kVPUD NO 1 OF CLALLAM COUNTY1.2 mi
#77404115 kVNORTHERN WASCO COUNTY PUD3.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207132, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207132 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HAPPY VALLEYSubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs68.5
UNKNOWN207546Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs66.8
FAIRMOUNTSubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs66.3
UNKNOWN209875Substation-AdjacentWAIsland County138 kV100 MW1.7 yrs64.1
QUILCENESubstation-AdjacentWAKitsap County115 kV100 MW1.7 yrs64.0
CHIMACUMSubstation-AdjacentWAIsland County115 kV100 MW1.7 yrs63.7
PORT ANGELESSubstation-AdjacentWAClallam County230 kV300 MW1.7 yrs63.2
TAP206505Substation-AdjacentWAIsland County161 kV100 MW1.7 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.