TAP207105

Substation

Washington · PUD NO 1 OF GRAYS HARBOR COUNTY

Max voltage
138
kV

TAP207105 is an electric transmission substation in Washington, operated by PUD NO 1 OF GRAYS HARBOR COUNTY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorPUD NO 1 OF GRAYS HARBOR COUNTY
Coordinates47.2368, -124.2084

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74830138 kVPUD NO 1 OF GRAYS HARBOR COUNTY12.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207105, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207105 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201837Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.4
TAP209297Substation-AdjacentWAGrays Harbor County115 kV100 MW1.7 yrs62.0
UNKNOWN202820Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.8
UNKNOWN202814Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.7
UNKNOWN207091Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.4
TAP207112Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.0
TAP207108Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.0
UNKNOWN207104Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.