TAP207102

Substation

Washington · PUD NO 1 OF GRAYS HARBOR COUNTY

Max voltage
138
kV

TAP207102 is an electric transmission substation in Washington, operated by PUD NO 1 OF GRAYS HARBOR COUNTY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF GRAYS HARBOR COUNTY
Coordinates47.1080, -124.0696

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74823138 kVPUD NO 1 OF GRAYS HARBOR COUNTY3.8 mi
#74827138 kVPUD NO 1 OF GRAYS HARBOR COUNTY9.8 mi
#74828138 kVPUD NO 1 OF GRAYS HARBOR COUNTY0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207102, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207102 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP207120Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.6
UNKNOWN201837Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.4
TAP207116Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs63.1
SCOTT STREETSubstation-AdjacentWAGrays Harbor County115 kV100 MW1.7 yrs63.0
TAP206449Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs62.7
UNKNOWN206446Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs62.4
TAP209297Substation-AdjacentWAGrays Harbor County115 kV100 MW1.7 yrs62.0
UNKNOWN202820Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207102 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.