TAP207085

Substation

Washington · PUD NO 2 OF PACIFIC COUNTY

Max voltage
138
kV

TAP207085 is an electric transmission substation in Washington, operated by PUD NO 2 OF PACIFIC COUNTY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 2 OF PACIFIC COUNTY
Coordinates46.4902, -124.0338

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74805138 kVPUD NO 2 OF PACIFIC COUNTY0.1 mi
#74806138 kVPUD NO 2 OF PACIFIC COUNTY8.4 mi
#74807138 kVPUD NO 2 OF PACIFIC COUNTY2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207085, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207085 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLATSOPSubstation-AdjacentORClatsop County230 kV300 MW1.7 yrs66.9
UNKNOWN202820Substation-AdjacentWAGrays Harbor County138 kV100 MW1.7 yrs61.8
HENKLE STREETSubstation-AdjacentWAPacific County115 kV100 MW1.7 yrs61.5
TAP207085Substation-AdjacentWAPacific County138 kV100 MW1.7 yrs60.9
UNKNOWN207086Substation-AdjacentWAPacific County138 kV100 MW1.7 yrs60.5
WARRENTONSubstation-AdjacentORClatsop County115 kV100 MW1.7 yrs60.4
RAYMONDSubstation-AdjacentWAPacific County115 kV100 MW1.7 yrs59.5
TAP207089Substation-AdjacentWAPacific County138 kV100 MW1.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.