TAP206504

Substation

Washington · PUD NO 1 OF JEFFERSON COUNTY

Max voltage
161
kV

TAP206504 is an electric transmission substation in Washington, operated by PUD NO 1 OF JEFFERSON COUNTY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorPUD NO 1 OF JEFFERSON COUNTY
Coordinates48.0984, -122.8004

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72921161 kVPUD NO 1 OF JEFFERSON COUNTY4.4 mi
#72919138 kVPUD NO 1 OF JEFFERSON COUNTY0.0 mi
#72920138 kVPUD NO 1 OF JEFFERSON COUNTY0.7 mi
#79093138 kVPUD NO 1 OF JEFFERSON COUNTY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206504, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206504 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FREEDONIASubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs68.6
HAPPY VALLEYSubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs68.5
BROOKS HILLSubstation-AdjacentWAIsland County115 kV100 MW1.7 yrs67.0
UNKNOWN207546Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs66.8
BANGORSubstation-AdjacentWAKitsap County115 kV100 MW1.7 yrs66.7
FAIRMOUNTSubstation-AdjacentWAIsland County230 kV300 MW1.7 yrs66.3
TAP206340Substation-AdjacentWAIsland County138 kV100 MW1.7 yrs66.1
UNKNOWN209875Substation-AdjacentWAIsland County138 kV100 MW1.7 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206504 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.