TAP206441

Substation

Washington · NORTHERN WASCO COUNTY PUD

Max voltage
230
kV

TAP206441 is an electric transmission substation in Washington, operated by NORTHERN WASCO COUNTY PUD. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerPUGET SOUND ENERGY INC
Coordinates47.0681, -122.2468

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72829230 kVPUGET SOUND ENERGY INC5.3 mi
#72831138 kVPUGET SOUND ENERGY INC7.1 mi
#77411138 kVNORTHERN WASCO COUNTY PUDIN SERVICE1.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206441, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206441 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TACOMASubstation-AdjacentWAPierce County500 kV1,000 MW1.7 yrs75.6
BERRYDALESubstation-AdjacentWAKing County230 kV300 MW1.7 yrs73.1
SOUTHWESTSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs72.4
TAP206230Substation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.4
TAP206441Substation-AdjacentWAPierce County230 kV300 MW1.7 yrs72.3
UNKNOWN205981Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs71.9
COVINGTONSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs71.8
COWLITZSubstation-AdjacentWAPierce County230 kV300 MW1.7 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.