TAP206343

Substation

Washington · PUD NO 3 OF MASON COUNTY

Max voltage
230
kV

TAP206343 is an electric transmission substation in Washington, operated by PUD NO 3 OF MASON COUNTY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage132 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 3 OF MASON COUNTY
Coordinates47.3682, -123.1600

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72663230 kVPUD NO 3 OF MASON COUNTY0.0 mi
#72666230 kVPUD NO 3 OF MASON COUNTY20.7 mi
#72662132 kVPUD NO 3 OF MASON COUNTY5.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206343, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206343 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SATSOPSubstation-AdjacentWAGrays Harbor County500 kV1,000 MW1.7 yrs72.0
OLYMPIASubstation-AdjacentWAThurston County500 kV1,000 MW1.7 yrs71.9
SHELTONSubstation-AdjacentWAMason County230 kV300 MW1.7 yrs70.3
UNKNOWN207537Substation-AdjacentWAMason County115 kV100 MW1.7 yrs66.9
BENSONSubstation-AdjacentWAMason County115 kV100 MW1.7 yrs66.5
UNKNOWN201448Substation-AdjacentWAMason County230 kV300 MW1.7 yrs66.3
TAP206345Substation-AdjacentWAKitsap County230 kV300 MW1.7 yrs66.1
TANGLEWILDESubstation-AdjacentWAThurston County115 kV100 MW1.7 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206343 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.