TAP206285

Substation

Washington · AVISTA CORP

Max voltage
115
kV

TAP206285 is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorAVISTA CORP
Coordinates47.3390, -118.6881

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72588115 kVAVISTA CORP8.0 mi
#72589115 kVAVISTA CORP0.0 mi
#72590115 kVAVISTA CORP23.7 mi
#78969115 kVAVISTA CORP0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206285, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206285 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP209184Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs68.6
TAP206251Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs66.5
TAP206253Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs65.9
TAP206284Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs65.3
UNKNOWN206254Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs64.9
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs64.6
RITZVILLESubstation-AdjacentWAAdams County115 kV100 MW1.7 yrs64.6
UNKNOWN206252Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206285 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.