TAP206250

Substation

Washington · AVISTA CORP

Max voltage
115
kV

TAP206250 is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorAVISTA CORP
Coordinates47.8399, -118.7002

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74348115 kVAVISTA CORP4.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206250, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206250 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRAND COULEE 500KVSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs69.6
GRAND COULEE 230KVSubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs69.4
GRAND COULEESubstation-AdjacentWADouglas County500 kV1,000 MW1.7 yrs68.8
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs64.6
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs63.4
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs62.9
Greenfield (GRAND COULEE 500KV - BELL)GreenfieldWALincoln County500 kV1,000 MW1.7 yrs62.9
Greenfield (GRAND COULEE 500KV - HANFORD)GreenfieldWADouglas County500 kV1,000 MW1.7 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206250 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.