TAP206114

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

TAP206114 is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPUD NO 2 OF GRANT COUNTY
Coordinates47.1059, -119.5248

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72449230 kVBONNEVILLE POWER ADMINISTRATION6.6 mi
#74197230 kVPUD NO 2 OF GRANT COUNTY6.2 mi
#74448230 kVPUD NO 2 OF GRANT COUNTY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206114, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206114 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN206104Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs74.5
TAP206102Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs74.1
TAP206105Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.3
UNKNOWN201377Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.0
TAP206112Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs72.0
TAP206103Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs71.8
ROCKY FORDSubstation-AdjacentWAGrant County230 kV300 MW1.7 yrs71.6
UNKNOWN209152Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206114 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.