TAP206112 is an electric transmission substation in Washington, operated by PUD NO 2 OF GRANT COUNTY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #74195 | 230 kV | PUD NO 2 OF GRANT COUNTY | — | 7.7 mi |
| #74196 | 230 kV | PUD NO 2 OF GRANT COUNTY | — | 2.3 mi |
| #74197 | 230 kV | PUD NO 2 OF GRANT COUNTY | — | 6.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP206112, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP206105 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 73.3 |
| TAP206112 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 72.0 |
| ROCKY FORD | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 71.6 |
| TAP209173 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 70.5 |
| TAP209182 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 70.0 |
| Greenfield (GRAND COULEE 500KV - HANFORD) | Greenfield | WA | Grant County | 500 kV | 1,000 MW | 1.7 yrs | 70.0 |
| UNKNOWN209177 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 70.0 |
| TAP209178 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 69.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP206112 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.