TAP206105

Substation

Washington · PUD NO 2 OF GRANT COUNTY

Max voltage
230
kV

TAP206105 is an electric transmission substation in Washington, operated by PUD NO 2 OF GRANT COUNTY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 2 OF GRANT COUNTY
Coordinates47.1382, -119.1932

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74187230 kVPUD NO 2 OF GRANT COUNTY7.5 mi
#74188230 kVPUD NO 2 OF GRANT COUNTY0.3 mi
#74189230 kVPUD NO 2 OF GRANT COUNTY0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206105, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206105 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP206105Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.3
TAP206112Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs72.0
ROCKY FORDSubstation-AdjacentWAGrant County230 kV300 MW1.7 yrs71.6
TAP209173Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.5
TAP209182Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0
UNKNOWN209177Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0
Greenfield (GRAND COULEE 500KV - HANFORD)GreenfieldWAGrant County500 kV1,000 MW1.7 yrs70.0
TAP209178Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206105 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.