TAP206075 is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorAVISTA CORP
Co-ownerBONNEVILLE POWER ADMINISTRATION
Coordinates46.9868, -118.2954

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68196115 kVBONNEVILLE POWER ADMINISTRATION5.9 mi
#72486115 kVAVISTA CORP5.5 mi
#74368115 kVAVISTA CORP15.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206075, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206075 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (LOWER MONUMENTAL - HANFORD)GreenfieldWAFranklin County500 kV1,000 MW1.7 yrs66.1
RITZVILLESubstation-AdjacentWAAdams County115 kV100 MW1.7 yrs64.6
UNKNOWN206076Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs62.0
GAFFNEYSubstation-AdjacentWALincoln County115 kV100 MW1.7 yrs61.9
TAP206273Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs61.8
UNKNOWN206270Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs61.3
TAP206075Substation-AdjacentWAAdams County115 kV100 MW1.7 yrs60.7
TAP206285Substation-AdjacentWALincoln County115 kV100 MW1.7 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206075 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.