TAP206061

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

TAP206061 is an electric transmission substation in Washington, operated by PUGET SOUND ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUGET SOUND ENERGY INC
Coordinates48.7192, -122.5044

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73979115 kVPUGET SOUND ENERGY INC0.9 mi
#74148115 kVPUGET SOUND ENERGY INC1.8 mi
#74149115 kVPUGET SOUND ENERGY INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206061, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206061 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CUSTERSubstation-AdjacentWASan Juan County500 kV1,000 MW1.7 yrs74.4
TAP206066Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs73.0
TAP206065Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs72.5
INTALCOSubstation-AdjacentWASan Juan County230 kV300 MW1.7 yrs71.1
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs70.2
SEDRO WOOLLEYSubstation-AdjacentWASkagit County230 kV300 MW1.7 yrs70.1
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs69.0
SEHOMESubstation-AdjacentWAWhatcom County115 kV100 MW1.7 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.