TAP206038

Substation

Washington · AVISTA CORP

Max voltage
115
kV

TAP206038 is an electric transmission substation in Washington, operated by AVISTA CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorAVISTA CORP
Co-ownerBONNEVILLE POWER ADMINISTRATION
Coordinates46.8532, -119.2496

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68136115 kVBONNEVILLE POWER ADMINISTRATION34.2 mi
#74351115 kVAVISTA CORP3.8 mi
#74352115 kVAVISTA CORP2.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206038, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206038 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIA GENERATING STATIONSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs73.5
TAP206105Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.3
TAP206112Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs72.0
ROCKY FORDSubstation-AdjacentWAGrant County230 kV300 MW1.7 yrs71.6
HANFORDSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs71.4
TAP209173Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.5
TAP209182Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0
UNKNOWN209177Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.