TAP206034 is an electric transmission substation in Washington, operated by PUD NO 1 OF KITTITAS COUNTY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF KITTITAS COUNTY
Co-ownerPUD NO 2 OF GRANT COUNTY
Coordinates47.1609, -119.9822

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74115230 kVPUD NO 1 OF KITTITAS COUNTY19.9 mi
#74116230 kVPUD NO 2 OF GRANT COUNTY4.3 mi
#74117230 kVPUD NO 2 OF GRANT COUNTY11.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206034, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206034 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIASubstation-AdjacentWAKittitas County500 kV1,000 MW1.7 yrs74.9
UNKNOWN206104Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs74.5
TAP206102Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs74.1
UNKNOWN201377Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs73.0
TAP206103Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs71.8
Greenfield (GRAND COULEE 500KV - COLUMBIA)GreenfieldWAGrant County500 kV1,000 MW1.7 yrs71.3
TAP206034Substation-AdjacentWAGrant County230 kV300 MW1.7 yrs70.8
UNKNOWN209152Substation-AdjacentWAGrant County115 kV100 MW1.7 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206034 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.