TAP206031

Substation

Washington · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

TAP206031 is an electric transmission substation in Washington, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Coordinates48.5040, -122.2012

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68039230 kVBONNEVILLE POWER ADMINISTRATION25.0 mi
#72423230 kVBONNEVILLE POWER ADMINISTRATION25.7 mi
#72424230 kVBONNEVILLE POWER ADMINISTRATION0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206031, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206031 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP206066Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs73.0
TAP206065Substation-AdjacentWAWhatcom County230 kV300 MW1.7 yrs72.5
MURRAYSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs72.1
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs70.2
SEDRO WOOLLEYSubstation-AdjacentWASkagit County230 kV300 MW1.7 yrs70.1
Greenfield (MONROE - CUSTER)GreenfieldWASnohomish County500 kV1,000 MW1.7 yrs69.7
Greenfield (MONROE - CUSTER)GreenfieldWAWhatcom County500 kV1,000 MW1.7 yrs69.0
SEHOMESubstation-AdjacentWAWhatcom County115 kV100 MW1.7 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206031 substation, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.